barn design

Email Subscription

05.17.18

Too Much Water

Rocana
By John Blackburn
One of my favorite sayings regarding water on a farm is, “Certainly not possible in all cases, and not likely in many, but if at all possible, try to ensure the water that leaves your property is as clean as when it came onto the property.”

My experience designing equestrian facilities, a personal interest in issues of sustainability, and my volunteer work with the Equine Land Conservation Resource, have raised my consciousness around land use issues regarding water. How a property drains it, where to find it, how to store it, and so on.

Whether your property suffers from too much or too little, water is an essential requirement for running an equestrian facility and has a significant impact upon the welfare of your horses, the efficiency of your farm and the budget of your operation. Water plays a big part in most Blackburn Architects equestrian projects. I thought I’d address a few solutions we can offer when there’s too much coming onto your property (not your barn – that’s another issue for discussion).

It’s a problem that has come up recently at a farm in Texas, where clients face excessive stormwater runoff on their farm. When the rains started this spring, suddenly excess water poured onto their land from two different counties; displacing basically an entire neighborhood’s volume of stormwater runoff onto their farm.

The team at Blackburn Architects will address this issue by determining the sizes of storages (dams or tanks) and diversions needed. Among the solutions that we’ll apply to divert rainwater off pastures and away from buildings and high-traffic areas in the coming weeks and months are:

Swales or Berms. Berms (elevated earth) and swales (shallow trenches) can act like gutters to redirect water away from areas that
get too much water. Planting grass, trees, and bushes will assist in stabilizing these natural water channels, so they don’t become victims of
flooding over time.

Catch Basins. A catch basin is an underground “reservoir” which collects water and drains it appropriately. Catch basins can
greatly improve farm drainage issues, allowing rainwater to flow through underground pipes leading to a sewer system or holding tanks (where it
naturally disperse). They offer a good method for moving water away from structures and off property, especially if you have to cross roads. At
Wyndham Oaks, in Boyd, MD, a Blackburn designed a system that takes water off the pastures and away from the structures, placing it into a long swale
that runs between paddocks.

Retention Ponds. Retention ponds usually fill as a permanent pool of water, and they can also serve to temporarily detain excess
stormwater. When stormwater enters these ponds, it’s released over a period of a few days, as water levels slowly return to normal.

All these methods of moving excess water can be interconnected. Run-off entering a catch basin flows through a daylight drain to swales located between paddocks. Before it leaves the site, runoff goes into a retention pond, which allows it to evaporate or gradually seep back into the soil, and recycle.

Posted in Equestrian News, News and Press | | Leave a comment >
02.23.18

Do You Need a Site Plan?

IMG_0541Today I got a call from a client who’s buying 120 acres in North Carolina and plans to build a new equestrian center. It’s been years since horses have been on the property. The pastures and paddocks are overgrown. The fences are in disrepair. The property has steeply sloped areas but the client wants a dressage ring. Drainage will be an issue. Together, we’ll figure out a way forward by starting with a Site Plan to map the future; completing the owner’s vision in budgeted stages over several years.

A site plan is completed by studying topography, wind and solar directions, neighborhood easements, height restrictions, zoning restrictions, soils and operational necessities (where are roads, pastures, barns, storage sheds, etc.), There are many benefits to putting together this “roadmap” for future use of the farm property. Consider that there are three major categories of costs when planning to bring horses onto your property: 1. Operational, 2. Environmental, and 3. Infrastructure. Proper planning will save you money in all three areas. Fewer roads, less fencing, better drainage all ensure that the whole farm, not just the horse barn but the entire collection of structures on the site, operates efficiently and safely.

Operational Considerations: First locate where you’ll put the horses – where is your turnout? Where will you store hay, equipment, or vehicles? Do you have access for manure pickup, large-truck deliveries, guests or visitors? Minimizing the number of steps necessary for your daily routine (turnout, stall mucking, etc.) will save labor time, which of course you know is money in the farm biz. Planning will also preserve space for paddocks.

Environmental Considerations: Figure out structure placement within your acreage. It’s important to properly orient any new buildings in the landscape. We design our barns to generate their own ventilation, placing them perpendicular to prevailing summer breezes. (One of many design considerations for maximizing light and ventilation, which is a subject I’ve written about often.) Additionally, placing structures where the land will drain easily makes good sense and will save you and your horses potentially hours of muddy misery or the cost of constantly replacing eroded footing.

Infrastructure Considerations: Fewer roads to maintain means fewer dollars spent.

Creating a master plan does not mean that every part of it needs be built at once. The plan may end up taking years to implement, but as each new structure or paddock is added, it isn’t done in the usual haphazard way. It will save you from asking, “You know, I could use a tractor shed somewhere?” Even those with very limited budgets should consider getting the advice of an expert at the planning stage, given the importance of the optimum farm layout.

Bringing in a professional to carefully plan a site doesn’t mean you need to commit to having a custom barn designed. Blackburn Architects’ guidance can help whether you’re purchasing a kit barn, designing a custom barn, or renovating existing structures. A site plan stands by itself as a service we greatly enjoy delivering to clients across the country.

Posted in Equestrian News, News and Press | | Leave a comment >
02.05.18

Celebrate a New Barn in 2020

beechwood aisle_small
Been thinking about a custom barn, or buying property with existing structures that need an extensive overhaul?

I thought I’d take a minute and explain Blackburn Architects’ process for designing a new equestrian facility and overseeing its construction. While not carved in stone, for planning purposes, can easily become a two-year process.

The first step is usually a visit by me or another Blackburn architect. The initial meeting is our first chance to meet, walk the site, look at any existing buildings and discuss the project goals. I’m a firm believer in “a picture is worth a thousand words” but “being there is worth a thousand pictures” Following this, we’ll send a proposal for service, which outlines the process and fees.
Once a contract signed, we get to work immediately.

The timeline usually looks something like this:
• 6 to 10 weeks for Feasibility Study, Site Assessment and Master Plan
• 1 to 2 months for Schematic Design
• 2 to 4 months for Design Development and Construction Drawings
• 1 to 2 months for Permitting
• 12 to 16 months for Construction

At Blackburn Architects, equestrian design starts with the horse and ends with a building that fits the horse, the owner, and the surrounding environment like a glove. It’s as simple and beautiful as that.

Let’s explain the steps in greater detail:

Feasibility Study / Site Assessment / Master Plan
The goal of the Feasibility Study is to determine, as early in the process as possible, whether the intended project fits the owner’s program, the site, and the budget.

We assess any existing building(s) and the site. We take measurements to determine if an in-place structure will work for the goals of the project. We study the land until we come to a clear understanding of wind and solar direction, soils, changes in elevation – all natural and architectural characteristics that guide placement and design of any new buildings. Central to the success of the project, this “Master Plan” addresses all these things and more, providing a road map for the success of all future phases of our work.

The site analysis also includes a review of applicable zoning and easements for the property; we determine what (if any) limitations or restrictions may apply at the property. Land disturbance allowances? Height restrictions? Set-backs?

In tandem with the site evaluation (as soon as we have a contract), we send the client a unique Blackburn Architects questionnaire that we’ve developed over the years. Answers are collected and inform the design; starting off the process with clear direction from the client. It is extensive and though it covers about 25 pages, once it is completed it “paints” a picture of exactly how you would like your farm to operate. The efficiency of the operation is critical and can have a huge impact on your operating cost and maintenance budget.

Schematic Design
Moving seamlessly from the master planning phase (often there is a fuzzy line here where one ends and another starts), we start schematic design. In this step, we help our clients visualize the project design with a variety of techniques using both computer and hand renderings to illustrate the scale and the relationship of the project elements. Ideas, concepts, goals take form at this stage.

Budget Development
Once we’ve worked up outline specifications for the work, we can begin to get a rough idea of the costs. At this point we will either develop a rough estimate based on our 35 years experience with over 300 farm projects, consult with a professional cost estimator or a builder who is familiar with the building type in your location.

Design Development and Construction Documents
Once we have the site layout, design, and budget, drawings and other documents give serious form to interior and exterior finishes, and firmly establish the size, character, and details of the project. These documents will be used by our professional consultants to design the electrical, gas, and other utilities. When these systems are defined, and we have a basic finish schedule and budget, we’re ready to file for the permit and start construct of the building.

Bidding and Construction Administration
With the construction documents complete, we can help clients select a contracting company through a “bidding” process for the work, or we can work with a client’s pre-selected Construction Manager. We work side-by-side with our clients to ensure that the best and most informed decisions are made during this process.

While in my experience this process typically lasts about 18 to 24 months, a lot of this depends on factors that are outside of either our control or our clients. The time of year and weather, for instance, can greatly influence how fast construction progresses, especially in colder climates. Pastures have a growing season, and they need at least a year (maybe two) to establish.

Designing and constructing a custom facility is a very subjective process, which is guided by all kinds of factors including the complexity and size of the structures, the time of year, the strictness of zoning regulations and neighborhood associations, state environmental regulations, and so on. But rather than let these things hold you back, I say, “Jump In” or give us a call to discuss how the process can work for you. When you slide open the doors to your dream facility and see the happy heads of your horses looking over the stall doors, all the time and effort will vanish. At least that’s been my privileged experience over all these years.

Posted in Equestrian News, News and Press | | Leave a comment >
10.30.17

Blackburn Barn Topics: Stall Flooring

Stall Flooring

In this on-going series, John Blackburn offers insight into component parts of equestrian facilities. With more than 35 years’ experience in the design of horse barns, he’s seen his share of good, bad and worse. In this installment, he gives advice on stall flooring. Still as applicable as ever, we’re reposting Sushil Dulai Wenholz’ article from The Horse, Sept 1, 2001 (added a few updates, too).

Stall Flooring
By Sushil Dulai Wenholz

You give a lot of thought to your horse’s health and happiness. You groom him until he gleams, swaddle him in boots and blankets, carefully monitor his diet, and expend considerable effort and expense making sure he’s comfortably bedded. But have you thought about what lies beneath that soft bed? In essence, the stall floor is the box spring beneath your horse’s mattress, and it’s every bit as important as what goes on top–perhaps more so.

No matter how nice the bedding, a poorly constructed floor can lead to respiratory troubles from ammonia gases, thrush from trapped moisture, achy joints from uneven or too-hard surfaces, and injury from slippery or abrasive materials. In addition, a poor floor can mean wasted bedding and extra labor for you.

A good stall floor starts with a good construction plan. John Blackburn, senior principal of Blackburn Architects, a 34-year-old firm that has designed more than 400+ barns in 35 states; and Peter Gibbs, Extension Horse Specialist at Texas A&M University, outline the steps involved in building a floor that will keep you and your horse happy, whether you’re revamping an existing stall or building a brand new barn from scratch.

Starting From Scratch

1. Pick the location. If you’re building a barn, you have the luxury of choosing the best site. Look for an area that’s dry or at least easy to drain. Avoid steep slopes, areas that are consistently wet, and locations that are subject to water runoff during heavy rains or snow melt. In terms of soil, you’re basically stuck with whatever is normal for your region. But if you have it, soil that packs tightly is ideal, says Blackburn, because it will provide a tough surface that isn’t too hard or abrasive.

2. Dig to the base. Whether you’re starting from scratch or redoing an existing stall, you need to dig down to a well-draining layer of soil. This will give urine and other moisture a path to drain away from your horse. Expect to excavate at least one foot deep over the entire stall, says Blackburn. You might have to go deeper, depending on local soil conditions.

3. Level the ground. You should level out that base layer to help make sure the surfaces above it are level. A nice, even plane puts less stress on your horse’s legs than an uneven floor.

4. Compact the base and fill. Even if the floor starts out flat, Gibbs explains that extended use can create a holey or uneven surface, especially with dirt or stone-dust flooring. To form a firm foundation that can withstand daily wear and tear for extended periods, compact the floor. You can use a hand roller, a motorized, hand-held compactor or “settler,” or some other heavy pounding tool to do the job.

First, compact the layer you’ve uncovered and leveled. Then begin adding layers of dirt or stone dust. “The important thing is to install the flooring in layers and tamp it at each layer,” says Blackburn. He recommends using three-inch layers for dirt or one- to two-inch layers for stone dust. Compact each layer “until you think it can take the abuse of hooves kicking at it,” he adds, noting that there isn’t a standard measure to go by.

To ensure good drainage away from the building, add layers until your floor’s surface is 12 to 18 inches above the natural grade around the barn, says Blackburn. “You want to get the moisture to drain through the flooring and away from the stall and barn,” he explains. In addition, this protects the floor from high water levels outside that might otherwise easily flood the stall.

Now you’re ready to add the floor itself. Next you’ll find basic installation information for several common types of flooring.

Adding the Flooring

Dirt–If you plan to have a dirt floor, and local soil drains exceptionally well, you’re done. Most soils, however, drain moderately well at best, so you’ll probably want to help it along. One option is to grade the top layer of dirt slightly (no more than three degrees), so that moisture runs off to exit the barn or stall through an outlet in the corner (or through the stall door to the aisle).

You could also make a “leach hole,” or simple drain, inside the stall. To do this, dig a hole about three feet in diameter and deep enough to reach that bottom, well-draining layer of soil at the base you created. Then fill the hole with varying sizes of rock (or alternating layers of sand and gravel), starting with large gravel chunks at the bottom and working toward stone dust at the top. Tamp into place and cover with dirt to even out the floor.

Stone Dust–Blackburn believes that stone dust (also known as crusher run, screenings, or quarter-inch minus) makes a better floor than dirt, “because it can compact well and still permits drainage.” However, he does recommend adding a subsurface drainage system to enhance flow-through. To do this, lay filter fabric over the floor, top it with a layer of crushed gravel, then add three to five inches of stone dust. As you did with the base, compact the stone dust after each one- to two-inch layer. When you’re done, water the floor, tamp it down tight again, and let it settle overnight. Fill in any holes or depressions the next day.

Another idea is to install a drainpipe under the stone dust floor. “I feel that this helps drain the moisture away from the stall area and allows you to flush the stall with moisture to cleanse the flooring,” explains Blackburn. “Otherwise, it could drain into the dirt and stone and stay there, providing odor and a breeding ground for bacteria.”

To lay pipe, first dig a swale–a sloped ditch about one foot deep. Lay perforated pipe into the swale (you want a piece long enough to provide drainage away from the building, notes Blackburn). Cover the pipe with filter fabric, then fill the swale with crushed gravel. Now add and compact your stone dust as stated previously.

Plastic Grid–Plastic grid flooring comes in many variations, but the basic idea is the same for all floors: To provide a 100% permeable floor plus a level, stable, durable surface. Installation instructions vary by manufacturer; however, most recommend laying the grid over a well-draining subsurface (such as stone dust) so that moisture not absorbed by bedding will drain away. Usually, the holes in the grid (which create the excellent drainage) are filled with stone dust.

Rubber Mats–As with grid systems, rubber mats (and similarly, rubber pavers, which look like rubber bricks) vary in design, thickness, texture, etc., from one manufacturer to the next. Likewise for installation instructions, although most want you to measure stalls so that mats fit snugly against each other and the walls. Unlike grids, however, mats and pavers are meant to trap moisture above the surface, where it can be absorbed by bedding. Moisture can seep through the seams (or possibly the rubber itself). So, flooring experts recommend that you lay mats over a well-draining subsurface, such as one of the crushed stone systems mentioned earlier, or over relatively nonporous materials such as concrete and asphalt that can be easily disinfected.

Asphalt–You can lay an asphalt floor yourself, if you’re willing to find a supplier, rent equipment, and learn the proper way to apply, rake, and settle it. However, it can be a tricky process. As Blackburn notes, “The right mix of asphalt is important. It should be raked as it’s installed, then hand rolled. I would imagine that hiring a professional would be advisable.”

He also suggests that you grade asphalt floors with a crown of one-eighth inch per foot in order to sustain drainage. “With a flat surface, the urine puddles and leaves the horse standing in dampness, potentially causing all kinds of hoof issues,” he explains. The slope will also facilitate drainage when the stall is washed or disinfected. Blackburn recommends the use of aggregate, or “popcorn,” asphalt, which offers a non-slip texture. And he strongly urges the use of rubber mats or rubber pavers to cushion this relatively rough surface.

Concrete–Many people are comfortable mixing and pouring their own concrete–an easier process than laying asphalt. For larger projects, you might want to hire outside assistance. Although moisture can seep through concrete over time, this footing is not as porous as stone dust. So, Blackburn recommends grading it at a rate of one-eight inch to one-quarter inch per foot to allow for drainage. Concrete should be cushioned with rubber mats or pavers, he adds, to reduce the risk of injury and musculoskeletal stresses that this hard flooring could cause.

A Note on Cost

Before you begin stall floor construction, you should create a budget for the project. However, as Blackburn notes, “The cost of different options can vary dramatically based on the number of stalls, location, and the material used,” as well as the specific suppliers, consultants, and equipment rental agencies with which you might deal.

For instance, says Blackburn, “I have found that the cost of asphalt flooring can range widely from area to area. And some suppliers require that a large quantity be ordered of the type and mix you need before they will supply it at a reasonable price.” Therefore, it could actually be more expensive, per stall, to floor a smaller barn than a larger barn. It’s important to contact local companies for estimates before you start the job. (For mass-manufactured, nationally distributed products like most rubber mats and plastic grid systems, you can check pricing with the manufacturers, many of whom have web sites.)

As you start compiling price quotes and creating a budget, Blackburn cautions that you consider not just the initial expense of purchase and installation, but also long-term costs. A dirt floor might be virtually free to install except for labor, but could be expensive in terms of labor over the long run. Rubber mats might be pricey at the start, but could pay for themselves through longevity, ease of care, and reduced bedding.

Also consider the stall flooring material can greatly impact the amount of bedding you’ll need to use. For instance, a stall floor with interlocking rubber brick can cut your bedding in half which can save on barn operations, offsetting increased installation costs.

Additional options for flooring include adhered cushioned or foam filled. To conclude, all stall flooring has an impact on the comfort of your horse, the material cost of installation, bedding requirements and your ability to clean and sanitize the stalls.

ABOUT THE AUTHOR
Sushil Dulai Wenholz
Sushil Dulai Wenholz is a free-lance writer based in Lakewood, Colo. Her work appears in a number of leading equine publications, and she has earned awards from the American Horse Publications and the Western Fairs Association.

Posted in Equestrian News, News and Press | | Leave a comment >
10.23.17

Blackburn Barn Topics: Stalls

stalls_small
In a new, on-going series, John Blackburn will offer his insight into the major component parts of equestrian facilities. In this post, John offers his suggestions on stalls:

1. Blackburn designs stalls of all sizes, but the most common is 12’x12’. 16’x16’ is often requested for larger horses, but with more space comes increased maintenance, a need for more bedding and a bigger area to clean. Larger stalls can, therefore add considerably to the cost of building a barn by:
a. Adding to the overall length and/or width of a barn.
b. Requiring roof framing to be increased from 2×10’s to 2×12’s or even greater.
c. Increasing the span of the framing lumber.

2. Partitions between stalls should be at least 8 feet high, but they don’t have to be solid from top to bottom. Barred or mesh portions on the top enhance ventilation. This also has the benefit of allowing horses to see their companions — and provides easy observation of the horses by their owners. The down side is the increased ventilation between stalls can increase the risk of bacterial infection between horses. For the same reason, doors that are open on top increase light and ventilation. Bars must not be more than 2 to 3 inches apart, and openings should not be more than 2 inches across to prevent hoof entrapment.

3. Steel mesh or bar fronts on stalls allow an owner to look down the aisle or into the stall as they walk down the aisle and see their horses. The mesh is good for ventilation, too. The drawback is that bedding can be kicked into the aisles, so we recommend adding bedding guards. Welded steel mesh is typically stronger than bars but the horizontals tend to collect dust and can add to barn maintenance.

4. Doors should be at least 4 feet wide. This is wide enough for a wheelbarrow to enter the space or for a horse and handler to exit or enter the stall. Sliding doors are preferred over swinging doors. If you must use swinging doors, remember to install them to swing outward. You’ll have a major problem if a horse goes down and the door swings to the inside. Additional safety reasons for outward swinging doors include:
a. Prevention of an unlatched door swinging open accidentally, or the wind catching it.
b. Added visibility of looking down an aisle and recognizing that a stall is open and empty. (Handlers need to leave stall doors open when the horse is turned out. This also makes it easier when bringing the horse back to the stall – you don’t have to open it.)

5. We recommend rounded edges in stalls and anywhere in the barn where horses have access. A casting rail (which can be a groove in the wall or a 2-by-4-inch rail bolted low to the wall), provides something for the horse to catch his foot on when rolling to avoid getting cast.

6. Provide for easy access to the stall for feed buckets without opening and closing the door. Place in one of the front corners adjacent to the aisle.

7. Automatic waterers have the advantage of offering constant fresh water, but be sure to buy a model that is easy to keep clean. If you don’t want automatic waterers, install water hydrants between every couple of stalls and provide for ample drainage for drips and overflows. Don’t forget to frost-proof them in climates where pipes are apt to freeze.

Posted in Equestrian News, News and Press | | Leave a comment >
02.13.17

Dear John: Renovating an Old Barn – The Fireplace Flue

Ohio Party Barn Int 2_small
Dear John,

Q: We’re renovating our fireplace, and want to incorporate the exposed fireplace flue shown in your German bank barn renovation. Where do you get the pipe for it?

Thanks,

Barn Enthusiast

 

 

Dear Barn Enthusiast,

Congrats on your barn conversion! We love breathing new life into these wonderful structures. To answer your question about the flue we used, It’s a galvanized steel flue, 12”-14” in diameter, and came in about 4 foot sections.  It should be pretty easy to find. Stainless steel is another good recommendation and look.  Galvanized is a little less expensive, but a little more rustic.

Hope that helps! Good luck with your project.

John

Posted in Equestrian News, News and Press | | Leave a comment >
02.02.16

Designing For Extremes: Snow & Ice

Coming off the heels of a truly epic storm for the Washington D.C. area (and most of the east coast!), I thought I’d take a moment to address how design techniques can help barns “weather” extremes.

In the United States, the upper northeast regions through to the Midwest are prone to experience weather extremes in the form of snow and ice. While we cannot entirely “weather proof” a barn, we can make it more resilient to some of the more damaging effects of weather phenomena.

Barn In A Blizzard

The roof of your barn needs to be able to:

  • Withstand the weight of snow and/or effectively shed it
  • Prevent or reduce the formation of ice dams
  • Redirect “roof avalanches” from sliding into high traffic or poor drainage areas and also reduce associated noise that could frighten the horses.

In addition to contributing to the Bernoulli principle I incorporate for natural ventilation, steeply pitched roofs also contribute to effective, gradual roof shedding and the redistribution of snow load. Ideally the pitch should be between 4/12 and 6/12 to get the optimal shedding effect (although, we generally try to keep pitches at 7/12 or more to take full advantage of the Chimney Effect and Bernoulli principle for natural ventilation)

Roofing material will also factor into how the snow will shed. Metal roofs are excellent as they are smooth and slick. They will also stay colder longer; reducing the likelihood that snow will melt and form ice dams (more on this below). Snow will shed from a metal roof even if the pitch is lower. Shingled roofs, however, will slow down the shedding process by “holding on” to the snow and allowing it to stay in place and accumulate. Consider a steeper pitch if you prefer a shingled roof as it will facilitate the shedding process over the rougher material.

Winley - Roof

Winley Farm – Millbrook, NY

 

Now, you might be saying to yourself, “Well, the snow is off the roof…but it’s all over the place! Now what?” Including strategic roof overhangs will complement the steeper pitch by helping to distribute shedding snow away from exterior walls and out of traffic and poor drainage areas. Be wary though, snow sliding off roofs can be noisy and frightening to horses, not to mention dangerous if it falls on you! Snow guards on the roof can help reduce the noise associated with shedding snow and keep huge sheets of it from falling on (and potentially harming) 2 and 4 legged passersby. Gabled dormers over entryways can also be useful. They help to direct snow off to the sides.

Beechwood Stables - Weston, MA

Beechwood Stables – Weston, MA

Snow guard

Snow guard

Ice dams are another unfortunate side effect of snow-laden roofs. An ice dam forms when the underside of the roof gets warm enough to thaw the bottom layer of snow sitting on the other side. The water makes its way down to the eave where it refreezes, eventually growing into a mound of ice. As the ice dam gets larger, it can pull the shingles and edges up allowing water to get through and into the insulation and walls. Water damage then wreaks havoc on the interior of the barn. The ice dam could also break off the eave and take pieces of the roof with it or fall on passersby. Sure, there are ways to deal with ice dams once they’ve formed, but natural ventilation can help prevent them upfront. Natural ventilation keeps the underside of the roof within 10 degrees of the outside temperature, which aides in keeping that critical layer of snow right on top from thawing and running down towards the eaves.

Damn ice

Damn ice

ice-dam-roof-graphic-a4who

Site and circulation planning can help prevent and/or reduce the impact of icy conditions around equine walkways. In the interest of horse safety, I try to design site circulation so that horses do not need to move over asphalted areas intended for trucks and service vehicles (there are other benefits associated with that as well). Asphalt is not great for horse’s knees, generally, but it is particularly problematic when wintery conditions lead to the formation of “black ice” — a thin sheet of ice over the asphalt that can be imperceptible to the horse or persons walking on to it. Horse pathways in and around the barn should include porous footing that absorbs and carries moisture away quickly. Presently there is no way (that I know of) to prevent pastures from freezing over, but you can maintain a dry paddock or “sacrifice” lot where your horses can be turned out when pastures have been effected by inclement weather. Paddocks with considerable slope can be particularly hazardous when they freeze over. That’s when a “level” dry lot can be very useful!

ice-storm-dec-16-2010-055

Caution!

 

As many on the east coast found out this past week, there is only so much preparation you can do in a couple of days before a storm hits. You, your horses, and your barn will benefit from built in preparation.

Posted in Equestrian News | | Leave a comment >
06.14.13

Feature in Equestrian Quarterly: “Let There Be Light”

This summer, Equestrian Quarterly has published an article discussing the elements of well-designed barns. The article features several equestrian architects, including John Blackburn. Check out the article to hear John’s thoughts on what make a well-planned facility, as well as to see a few photos from our assorted projects. There is even mention of John’s new book, Healthy Stables by Design, that will be coming out this fall.

Click here to access the article “Let There Be Light”.

Posted in Sustainable Design | | Leave a comment >
05.16.12

Designing Equestrian Facilities

Quite a few years ago, I participated in a web chat (remember those?) with the folks at EquiSearch. During the chat, a few chatters presented me with questions about their barn projects, which ranged from “how to’s” regarding initial planning stages or “what now’s” after building the basic framework. For old time’s sake, I thought I might share the chat’s transcript. For the sake of those reading today, I’d like to encourage any and all of you to ask away with questions or to present design issues of your own.

gatsbysmom – How much roof overhang do you recommend for a barn in the South?

Blackburn – Gatsbysmom…roof overhangs are very helpful in the south for shading…if you have Dutch doors where horses can stick their heads out, it allows them to do it…make sure the roof is projected out far enough so runoff doesn’t drop on the horses’ heads…a good dimension is 3.5 feet.

Posted in Equestrian News | | Leave a comment >
01.25.12

Ask the Equestrian Architect: What’s in it for Me?

I think that’s the top question I get (the gist of it, anyway) and it SHOULD be. Why should you hire an architect to design a horse barn? Or, Is hiring an architect to design a barn really necessary?

In short: no. However, hiring an equine architect can save you time, your horse’s health and safety, and even money in the long run. Allow me to state my case.

A horse is so much more than a pet: it’s a companion, a worker, a teammate, an athlete. Whether you ride for pleasure or compete, the horse—your horse—is irreplaceable. I wish not to gild the lily just to make my point, which you already know, that horse owners think the world of their horses and want to treat them with the utmost care and respect. If you keep a horse, it’s your duty to protect it. While a horse is perfectly pleased to graze outdoors most days, the barn is a necessity – so I say, let’s do our best to protect that horse and maybe make your life a little easier in the process.

"Barn? What barn? We're good right here."

Barn This Way – Product vs. Service

When you decide to build a barn, you have a few choices. The least costly solution is to purchase a prefab or kit barn. The prices range (rather wildly), as does the package itself. Labor is often an additional cost as well as nails, roofing, and concrete costs. Usually a contractor charges between 10 to 25 percent of the total cost of materials for construction services. However, this percentage may go up if your project is on the small side in order for it to be financially viable for the contractor. For many horse owners, a prefabricated or kit barn is a perfectly reasonable and cost-effective solution.

If you’re looking for a step above prefabricated, or can afford to customize your project a bit, you may then wish to research design/build contractors – but this is where I’d stop and suggest that you alternatively consider working with an equestrian architect.

Why? A design/build contractor is selling a product, not a service, and is not often a trained architect, which limits his or her ability to think creatively outside of the box. In most cases, thinking outside of the box eats up profits and costs more money (for the design/build contractor). For a design/build contractor, the goal is to build quickly above all else. I think this compromises your program and the overall result because the design/builder does not want to eat up time resolving special issues or conflicts. The design is usually cookie cutter, following whatever pattern the design/build contractor typically uses, and there is no one there to really represent the owner (you) and oversee the quality of the project and if it’s built as intended or promised.

To Serve and Protect

With an equestrian architect, you’re purchasing a service rather than a product. The architect is there to resolve the needs of the owner, from overall site planning, programming, phasing, and design to overseeing the entire construction to make sure the barn is built as intended. The service costs a bit more than a design/build contractor but, if your barn is your livelihood or your sanctuary, I believe that you’ll save time and stress, frankly by getting it done right the first time.

Typical services an equestrian architect (straight from the horse’s mouth here, if you’ll forgive my pun) will provide:

  • Site planning: can reduce infrastructure costs (fewer roads, less fencing, better drainage, etc.) and improve the site to function at its best for your needs.
  • Programming: ensures that the whole farm (not just the horse barn but the entire collection of structures on the site, if applicable: residence, guest house, caretaker’s quarters, hay/bedding, vehicle storage, etc.) operates efficiently and safely.
  • Code analysis: certainly the codes vary across states/municipalities. We’ve designed horse stables in counties with very specific codes and regulations and understand what to look for and how to work with the various officials to resolve issues. The architect can save you a lot of hassle!
  • Budget Development and Cost Control/Scheduling: I like to develop a budget as early in the process as possible and revisit it periodically during the project. My job is to determine if the owner’s programmatic needs and budget fit the site, and if the design aesthetic suits their personal design goals. We can also plan to develop the barn or various structures in phases, if applicable.
  • Conceptual Design: Here we develop the character and massing of the structure(s) and prepare a preliminary floor plan and elevations to illustrate our ideas. At Blackburn, this is the final phase of what we call Master Plan Services (site plan, written program, conceptual design, and preliminary construction development). From here, we move on to more detailed design work.
  • Schematic Design: After we complete a master plan that works well for the owner, we begin to prepare detailed drawings to give you an idea of the layout and general appearance of the barn (and possibly other buildings). We’ll talk about finishes, materials, stalls, tack rooms, etc. For a lot of people, this phase of design is the fun part!
  • Design Development and Construction Drawings: Here we’ll really start to nail down the final design and specify the materials, stall systems, finishes, and other details and prepare construction drawings that instruct the contractor how to build the barn.
  • Bidding and Construction Administration: Because construction drawings are open to interpretation, it’s important that the architect works with the contractor to oversee that the project is carried out according to the design intent. We’re the owner’s rep to make sure that construction is done well and done right.

I understand this may seem like a lot, but each is a valuable step toward designing a healthy, safe, and functional facility. As an architect, I want to study how you operate and design a barn that feels inviting and personal (because it is). No barn or farm operates exactly alike as each owner or barn/farm manager operates his/her facility in a particular fashion. While designing a barn from scratch is not realistic for everyone, if you are choosing between a design/build firm and an equestrian architect, I’d strongly advise that you approach both for more information and weigh out your options carefully. It could save you your horse.

As always, I invite your questions and comments. Thanks for reading!

Tidewater Farm

An architect is trained to design as the great Louis Sullivan (1856-1924) states: “Form ever follows function.” After all, if your barn doesn’t function properly, what’s the point of a great design?

Posted in Equestrian News | | 2 comments >
  • Page 1 of 2
  • 1
  • 2